D3 · Renewables & self-generation

Store your energy on site and self-consume 100% of it.

Solar feasibility study, storage sizing, identification of the applicable regulatory regime: a costed, defensible self-generation trajectory.

Self-qualification

You are concerned if…

  • You want to cover part of your consumption with a rooftop or ground-mounted photovoltaic plant
  • You don't know which regime applies: declaration, connection approval or authorisation
  • Your existing installation is not delivering the performance ratio you were promised
  • You are a developer or planner seeking an independent opinion on the installer's work
Activities covered

Two activities, one anchor and one block per activity

1

PV, BESS & EV charging studies

Sizing of the plant, storage and charging, yield estimate, connection scheme and economic model. Filing of the application with the grid operator under the relevant one of the decree's three regimes, EPC tendering and supervision of works through to commissioning.

Flagship deliverable
Sizing study, LCOE and LCOS, regulatory file and connection agreement
Standard
Laws 13-09 and 82-21, decree 2-25-100, ANRE framework, 20% surplus cap
2

PV performance audit & analysis

Inspection of existing installations and post-commissioning acceptance: performance tests, performance ratio measurement, electrical safety and compliance, punch-list closeout, remediation plan and O&M opinion.

Flagship deliverable
Acceptance record + performance audit report
Standard
IEC 61724, IEC 62446, NM and NF C 15-100
What you receive

Delivered objects, not billed hours

  • Sizing study, LCOE and LCOS
  • Regulatory file and connection agreement
  • Acceptance record and performance audit report
Solar carport shading a parking area in front of a commercial building
Illustration — a solar carport over a parking area, a typical self-generation configuration.
Sector context

Self-generation starts on the rooftop

An industrial rooftop is the most common site for a self-generation photovoltaic plant — before grid connection, the applicable regime, or a surplus resale contract even come into play. Department D3 sizes, files and verifies each of these steps.

Illustration — residential photovoltaic self-generation with storage and electric vehicle charging.
Residential & tertiary segment

Self-generation isn't just for industry

Villas, residences and small tertiary sites follow the same regulatory path as industry: sizing, choice of ANRE regime, grid connection. Department D3 applies the same rigour to the file, at a smaller scale.

Estimate my residential solar plant
Standards applied

The body of standards that makes the deliverable defensible

  • Laws 13-09 and 82-21, decree 2-25-100 — self-generation framework
  • ANRE framework — handling of the three connection regimes
  • IEC 61724, IEC 62446 — monitoring and testing of PV installations
  • NM and NF C 15-100 — electrical installation safety
Method

How a mission unfolds

1

Qualification & scoping

Identification of the applicable regime and project scoping.

2

Collection & calculation

Sizing, yield estimate, economic model.

3

Technical exit review

Review by Doctrine & Methods before delivery.

4

Delivery & handover

Regulatory file, connection agreement or performance report handed to the client.

5

Mission extension

Works supervision, commissioning, performance follow-up.

Illustration

An anonymised case

Illustrative example — no named reference
Context
A hotel property filing a rooftop photovoltaic self-generation project.
Scope
Sizing study, identification of the applicable ANRE regime, connection filing.
Result
Connection agreement obtained and works supervised through to commissioning — illustrative order of magnitude, not audited.
Who leads this expertise

D3 lead filled · PV owner's engineer (P0)

A detailed profile (education, certifications, years of practice) will be published by Management in wave 2, in line with the go-live roadmap.

Qualification

Identify my regulatory regime

This form sends your request directly to contact@morweis.com, assigned to department D3.

Your request is sent directly to contact@morweis.com — response targeted within 5 business days.

What our visitors search for
decree 2-25-100 self-generation Morocco law 82-21 ANRE connection connection agreement 20% surplus resale photovoltaic plant performance audit battery storage Morocco